History

From day one, we dared to take challenge. We tried to introduce ventures that were unheard of in this region. We are proud to be trend-setters in many ways.

United Engineering & Power Services Ltd. acquired Integrated Management Systems (IMS) certification from Bureau Veritas,

United Ashuganj Energy Ltd awarded the Best Private Power Generation Unit at National Power & Energy Week 2016

2016

Commissioning of the Country’s 1st Combined Cycle, Modular Power Plant.

United Ashuganj Energy Ltd., United Ashuganj Energy Ltd. awarded Gold, Silver & Bronze Awards at the Asian Power Awards 2015

United Group shifted its Corporate Headquarters to Gulshan Centre Point.

United Power Generations & Distribution Company Ltd listed in Dhaka & Chittagong Stock Exchanges.

Largest loan sanctioned by United Ashuganj Energy Ltd. amounting to US$ 58.5 million through the IPFF facility in Bangladesh

2015

Launch of Gunze United Ltd., Shajahanullah Power Generation Company Ltd. & Unimart Ltd. 

2013

إطلاق أشوجانج المتحدة الطاقة المحدودة

٢٠١١

الإطلاق لتوليد الطاقة المتحدة & المحدودة شركة التوزيع

٢٠٠٧

Launch of United Hospital Limited. & Operation began in United Land Port Teknaf Ltd.

2006

إنشاء نبتون الأراضي التنمية المحدودة.

٢٠٠٥

إطلاق المتحدة مستشفى المحدودة، المحدودة روتوسبين المتحدة، والجامعة الدولية المتحدةوالرعاية الصحية نوفو آند فارما المحدودة

٢٠٠٤

المتحدة البيت يصبح المتحدة المجموعة الجديدة الصفحة الرئيسية

٢٠٠٢

ولادة البوليمر المتحدة المحدودة

١٩٩٨

أول IPP خولنا سلطة الشركة المحدودة

١٩٩٧

مشروع مشترك في كوميﻻ الغزل المطاحن.

١٩٩٦

الحصول على فإن عمرون دبابة المحطات المحدودة

١٩٩٥

المتحدة الحصول على قمة خزان المحطات المحدودة.

١٩٩٢

اندماجات حلم بناه المحدودة.

٩٠ الانتقال المبكر

اقتناء ناقلات النفط. المشاركة في المشاريع الحكومية المختلفة.

٨٠ الراحل

الممثل الحصري "كوبيرس شركة الولايات المتحدة الأمريكية".

١٩٨٣

الدولية التعرض عن طريق تجارة المقايضة.

٨٠ المبكر

إدراج كشركة ذات مسؤولية محدودة.

١٩٧٩

بدء كمجموعة موحدة.

١٩٧٨